Auto Alternator Stator For Mitsubishi 85A ER/IF Alternators,27-8311 Â Size:12V 85A Â WAI:27-8311 Â Fits Unites: Auto Alternator Stator For Mitsubishi 85A ER/IF Alternators,27-8311 Â Size:12V 85A Â WAI:27-8311 Â Fits Unites:
Advantages:
1.Adopting Weichai diesel engine,good reliability,large torque reserve,low fuel consumption,
high economic benefits;
2.Adopting 13 inch double clutch ,high transfer ability,reliable effect,operation more comfortable;
3.Gear box use 4X(3+1), 12 forward gears,4 reverse gears, gear are reasonable, high working efficiency;
4.Adopt independent power output device,steady transmission,large bearing capacity;
5.Using independent oil hydraulic steering system operation,flexible operation,reliable energy saving;
6.Using disc brakes,large braking torque,good braking effecting;
7.Using forced type lifter, reliable use, convenient maintenance;
8.Final drive adopts planetary reduction structure,compact structure, large reduction ratio;
9.New streamlined appearance, greaceful ,fashion;
Tractor Model
1104
Tractor Type
110hp, 4wd
Engine Type
6 cylinders/ 4 stroke
Engine power (kw)
81
Rated speed (r/min)
2300
Parameters
Min. Turning radius
7.0±0.3
Rated traction force
≥27KN
Theoretical Speed range
Forward(2.06-26.92km/h)
Max. lifting force
>24KN
Wheel Tyre
Front Wheel Tyre
14.9-24
Front Wheel Tyre
16.9-38
Dimensions
Min. Ground clearance
470mm
Wheelbase
2688mm
Front wheel tread
1672-2003mm
Rear wheel tread
1662-2262mm
Overall dimension (L*W*H)
5040*2255*2860mm
System Model
Gear Shift number
Independent form, the all-hydraulic front wheel changes direction.
PTO (r/min)
The all hydraulic power steeringBZZI-E1000C
Hanging Device
Independent form, the all-hydraulic front wheel changes direction.
Lifting Device
The all hydraulic power steering
Model of Steering device
independent oil way,front-wheel turn with full hydraulic
Control model of plough depth
independent oil way,front-wheel turn with full hydraulic
After-sales service
1.Warranty
Gold Dafeng grants our clients twelve-month-period warranty for any machine purchased from us which could reach the certain target quantity. During the warranty period, in case the defect of material or workmanship has occurred with spare parts in normal operation, the defective part will be repaired or replaced free of charge, at our discretion.
2.Spare parts
Gold Dafeng is dedicated to provide our clients with genuine spare parts with the highest quality, exact fitness and appropriate function. With our global distributor network, you are guaranteed with fast delivered and services, wherever you are, please submit your spare parts request to us, and list products name, model, equipment serial number, description of required parts. We guarantee that your request will be handled quickly and appropriately.
3.Installation&Maintenance
Gold Dafeng is able to provide you with the overall installation of complicated machinery and equipment, allowing you to start the normal operation of handling machinery immediately. After installation, we will make inspection of the whole machine, operate equipment, and provide you with testing data reports of installation and operation.
4.Training
Gold Dafeng offer perfect facilities and comfortable environment and can provide training service to different users. The training sessions include product training, operation training, maintenance know-how, technical know-how training, standards, laws and regulations training and other training, all of which are tailored to fulfill your individual needs. Training programs can be conducted in our factory field, or at the client`s site.
5.technical advice
Gold Dafeng can also help clients coordinate with trained service personnel to provide you detailed and extensive knowledge about your specific machine. With our technical advice, your machine service life can be significantly prolonged and sustained with high capacity.
110Hp Wheeled Tractor,110Hp Farm Wheeled Tractor,Wheeled Small Farm Tractor,Wheeled Farming Tractor Shandong Gold Dafeng Machinery Co., Ltd , http://www.golddafengharvester.comÂ
We Promise:
Â
Mitsubishi 85A ER/IF Alternators
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our goods in ZACH  boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters and the order quantity reach our requirment.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packagesÂ
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 5 to 7 days if we have stock and take 30 to 50 days if need to produce after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,Â
no matter where they come from.
Â
Â
We Promise:
Â
Mitsubishi 85A ER/IF Alternators
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our goods in ZACH  boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters and the order quantity reach our requirment.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packagesÂ
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 5 to 7 days if we have stock and take 30 to 50 days if need to produce after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,Â
no matter where they come from.
Â
Reverse(4.45-12.59km/h)
(1760mm when they leave factory)
(1662mm when they leave factory)
Auto Alternator Stator for Mitsubishi 85A Er/If Alternators, 27-8311
Model NO.: ZA-T1036
Voltage: 12V
Head Cover Position: Front
Brand: Mitsubishi
Size: 12V 85A
Car Make: for Mitsubishi 85A Er/If Alternators
Model Numer: Mitsubishi
OE No.: Honda 31102-P01-004
Warranty: One Year
Place of Origin: Anhui, China
Certificate: ISO/Ts16949
Condition: 100% New
MOQ: 10 PCS
Package: Nuetral Carton Packing or Customized Requirements
Trademark: MITSUBISHI/ZACH AUTO
Transport Package: Strong Wood/Box Packing
Specification: 12V 85A
Origin: Anhui, China
HS Code: 8511509900
Model NO.: ZA-T1036
Voltage: 12V
Head Cover Position: Front
Brand: Mitsubishi
Size: 12V 85A
Car Make: for Mitsubishi 85A Er/If Alternators
Model Numer: Mitsubishi
OE No.: Honda 31102-P01-004
Warranty: One Year
Place of Origin: Anhui, China
Certificate: ISO/Ts16949
Condition: 100% New
MOQ: 10 PCS
Package: Nuetral Carton Packing or Customized Requirements
Trademark: MITSUBISHI/ZACH AUTO
Transport Package: Strong Wood/Box Packing
Specification: 12V 85A
Origin: Anhui, China
HS Code: 8511509900