Formula Thickener Agent Silica Dioxide,7631-86-9 Silicon And Silicon Dioxide,Thickening Agent SiO2 Silicon Dioxide Guangzhou Quanxu Technology Co Ltd , https://www.inkjetcoating.comSilica dioxide, one of the materials that is used in printing thickener. It is mainly used as additive. To using suitable silica dioxide into printing thickener, we change our original silica dioxide's chemical parameters.
The main function of printing thickener is to provide good rheological properties. It transfers the sizes or colour sizes on printing screen and roller to the fabric to combine dyes with fibers to ensure the clear outline of printing patterns. The pattern is clear, the color is bright and even. When the dye is fixed, the reaction products and residues can be easily removed in the downstream process, which makes the fabric feel soft. It can be seen that printing thickeners play an important role in the printing industry.
We focus on the Matting Agent about 25 years, knowing exactly the customer`s requirement, and have most experience to offer service and technical solution to the customers. We have strict control of the quality; the physical index and performance are strictly tested before delivery. Will ensure that stable products of different batch. Compare to International and the other Chinese Supplier, our products has better performance, stable quality and cost efficient.
Filling mining method to control ground pressure examples (1)
First, Zhaoyuan Gold Mountain mine the ore vein 5 Â
The No. 5 vein of Lingshan Gold Mine of Zhaoyuan Gold Mine is a medium-thick and steeply inclined lenticular ore body. From September 1983, the downhole layered cement filling method was tested on the 1903 west stope of the ore body, and it has been promoted and applied in the mining sites such as 1908 and 1909.
In disseminated ore veinlets pyrite phyllic granitic rock fragmentation based on the plate granite, mylonite joints is developed, not stable, easy falling. Sericite footwall of potassium granite, more robust.
The 1903 west mining field is 16m long and 40m high. The width is equal to the thickness of the ore body (average thickness is 14.5m). The ore body inclination angle is 51.5°. The mining approach is arranged along the ore body, with a stratification height of 2.7 to 3.0 m and an access width of 2.5 to 4.0 m. From the upper plate to the lower plate, the two-step recovery is carried out, and one way is taken back through one way, and the cement is filled after the completion of the production. The cemented filling material has a ratio of lime to sand of 1:4 to 1:8 and a weight concentration of 78%. After the two sides of the road are filled with cement, the intermediate approach is taken back. Therefore, the mining operation is carried out in three stages: the first stage, the one-step recovery and the goaf are not filled; the second stage, after the one-step recovery, the goaf The cementation filling is carried out; in the third stage, the two-step rubber-filled inter-body inlet is taken back, and the goaf is not filled.
The finite element calculation and the on-site stress-strain measurement were carried out for each stage of the recovery, and the results are shown in Table 1 and shown in Figure 1.
Table 1 Variations of stress and strain of surrounding rock with different cementation filling method in Lingshan sub-mine
position
project
Data acquisition method
unit
Mining stage
The first stage
second stage
The third phase
Route
Maximum principal stress of the top plate (middle of the top plate)
Maximum principal stress of the bottom plate (middle of the bottom plate)
Finite element calculation
Ibid.
MPa
MPa
-2.17
-0.51
Pillar
Maximum principal stress
Stress concentration factor
Ibid.
Ibid.
MPa
19.9
2.9
17.12
2.49
Charge
fill
body
Maximum principal stress (vertical top plate)
Ibid.
Steel string dynamometer
Telemetry strain gauge
MPa
MPa
MPa
2.62
8.54
2.0 to 2.15
2.4
Affected by the plate (vertical ore contact surface)
Finite element calculation
Steel string dynamometer
MPa
MPa
0.51
0.7
on
plate
Wai
rock
Maximum principal stress
Maximum shear stress
Stress concentration factor
Finite element calculation
Ibid.
Ibid.
MPa
MPa
15.69
5.75
2.3
13.95
4.26
1.96
22.28
7.36
3.27
Displacement into the stope
Ibid.
Multi-point displacement meter
Cm
Cm
1.65
2.17
Fig.1 Stress distribution curve of surrounding rock of 1903 west stope
A-recovery first stage; b-recovery second stage; c-recovery third stage
1- top plate σy distribution curve; 2- top plate σx distribution curve; 3- bottom plate σy distribution curve; 4- bottom plate σx distribution curve
It can be seen from Table 1 and Figure 1 that in the first stage of recovery, after a stepping road is recovered, a large vertical compressive stress is applied in the pillar, and horizontal tensile stress occurs in the top of the inlet and the middle of the floor. In the second stage of recovery, that is, after a stepping road for cementation filling and good roofing, the stress concentration of the pillar is moderated, and part of the roof pressure is transferred to the filling body, so the maximum principal stress of the pillar is reduced by 13.7%, and the stress concentration factor is Reduced from 2.9 to 2.49. The third stage filling body is used as the artificial column to support the top and bottom plates. At this time, a large part of the roof pressure has been moved to the surrounding rock of the upper and lower plates, and the pressure above the filling body is small. This fully demonstrates that if the filling is good, the filling body can withstand part of the roof pressure and improve the stress distribution of the roof. Although the surrounding rock has a certain pressure on the filling body, due to the limitation of the filling body, the displacement of the surrounding rock into the stop is small, and the stop is in a stable state under the support of the filling body. .