To simplify the process, research separator electrodeposition process of FIG. 1 in place of the iron powder and chlorine substitutions regeneration step. The principle is that in a case where the control of an appropriate potential, so that bismuth diaphragm electrolyzer reduced at the cathode: The oxidation of iron occurs at the anode: Figure 1 bismuth ferric chloride leaching of tin ore - iron replacement mentioning the bismuth process flow diagram The technical key to this process is the control of the electrode potential and the control of the solution through the velocity of the membrane. In the cathode region, the main cations in the solution are Bi 3 + , Fe 2 + and H + . In the anode region, the main cations in the solution are Bi 3 + , Fe 3 + and H + , which are trivalent irons in the anode region. Without reducing the current efficiency at the cathode, the cathode and anode should be separated by a suitable separator material. The liquid level in the cathode region should be higher than the anode region, and the permeation rate of the electrolyte should be controlled so that the flow rate is equivalent to the oxidation rate of the ferrous iron. Compared with the ferric chloride-iron powder replacement method, the process is simple. However, due to the high concentration of iron ions in the solution, the ferroelectric process will inevitably reduce through the diaphragm under the action of the electric field force, which will reduce the current efficiency (current efficiency 42% to 50%). strict. Naipu WS Dredging Pump is single-stage single-suction cantilever horizontal Centrifugal Pump with advantages of light weight ,good wear-resistant ,super dredging performance ,perfectly suited for the dredge on the whole construction ,high multiple economy benefits and so on .It throughout meets requirements of the dredge to dredging pumps .The pump mainly consists of the pump head , gearbox specifically for the dredging pump ,high elastic coupling and supervisor system of the driving device for the dredge.
Sand Reclamation
WS Dredging Pump Construction Drawing
Main Part Number At The Drawing
Materials of Construction
VOLUTE
IMPELLERS
BASE
EXPELLER
EXPELLER RING
SHAFT SLEEVE
SEALS
Standard
High Chrome Alloy
High Chrome Alloy
Cast Iron
Chrome Alloy
Chrome Alloy
SG Iron
Natural Rubber
Options
SG Iron
SG Iron
Mild Steel
SG Iron
SG Iron
EN56C
Nordel
Dredging Slurry Pump, River Sand Dredging Pump, Submersible Dredging Pump, Horizontal Dredging Pump Shijiazhuang Naipu Pump Co., Ltd. , https://www.naipu-pump.com
Typical Applications---
Suction Hopper Dredging
Constructional Material
Sand gravel processing
Barge Loading
2 – Frame
3 – Mechanical Seal Assembly
4 – Connecting Plate
5 – Rear Liner
7 – Cover Plate
8 – Front Liner
9 – Impeller
10– Support
or
SG Iron
or
SG Iron
Fabricated
Ferralium
Hasteloy C
Ceramic
Stellite
Chrome Oxide
Neoprene
Viton
Butyl
EPDM
WS Dredging Pump Selection Chart
WS Dredging Pump Performance Parameters
Antimony trichloride leaching - diaphragm electrowinning method
1 – Shaft
6 – Pump Casing