Portable Transport Wheelchair,Transfer Wheelchair,Portable Aluminium Manual Wheelchair Brother Medical Products Manufacturer Co.Ltd. , http://www.shmedicalproducts.com
Prev: Hunan's Violent Case of Runaway Case: Suspects Suspected
A farmer in Zhejiang sued the telecommunications company for "Dog Rights"
A farmer in Zhejiang sued the telecommunications company's diesel generator | diesel generator price for the “pigeon rights protection†price/2010-08-23
Since the communications tower was built on the north side of its own pigeon farm, every thunderstorm day, a significant increase in thunder will cause the pigeons to be frightened to varying degrees. In order to protect the pigeon's “healthâ€, the owner Yang Mou’s local will Telecommunications company sued the court. A few days ago, Zhejiang Deqing County Court accepted the case and will proceed further.
Yang, owner of the breeding pigeon farm, had encountered a blockage since December last year. The local telecommunications company built a communications tower on the north side of his pigeon farm. At first, he did not realize any wrong. Gradually, I don't know whether it is a psychological suggestion or if it's true. He feels that every thunderstorm, thunder increases significantly more than usual. Several times the computers in the dorm building were damaged by thunder and the pigeons were frightened to varying degrees. Afterwards, Yang met with the Deqing County Safety Production Supervision Bureau, the Deqing County Meteorological Bureau, and the local township government.
On March 10 this year, the local township government held a coordination meeting. The telecommunications company said at the meeting that the communications tower has lightning protection devices that can reduce the number of lightning strikes. Its construction is in line with national standards, and radiation will not affect people. The health effects. Deqing County Meteorological Bureau and Safety Supervision Bureau respectively expressed their opinions from the technical and safety professional perspectives, and suggested that telecommunication companies should contact the relevant qualified intermediary agencies as soon as possible whether the telecommunication tower will be surrounded by people, electrical equipment and breeding after being struck by lightning. Make assessments based on the impact of the industry and make further deliberations based on the results of the assessment.
On August 3, the local telecommunication company responded to the electromagnetic radiation problem of the communication tower. After the telecommunications tower was opened, the radiation environment monitoring station of Zhejiang Province was commissioned to make relevant inspection reports. The monitoring results conform to the Chinese national standards and the communication tower will not The surrounding environment has caused other effects.
Yang believes that the test report only assesses the radiation situation of the telecommunications tower and does not involve the risk of lightning. As a result, on August 16th, he filed a lawsuit against the local telecommunications company.
A few days ago, Zhejiang Deqing Court accepted the case and will proceed further. (Finish)
Next:Installation, use and regulation of marine diesel generator sets