Adjusted port of discharge, using methods based lead wire ball, to the crushing chamber through the port of discharge at the discharge mouth size measurement. The processed new liner can be measured at one point, and the unprocessed or worn liner should be measured 6-8 points. After the discharge port meets the dimensional requirements, use the lock cylinder to lock the adjustment ring, otherwise it is not allowed to drive. Polycarbonate Solid Sheet ,Solid Polycarbonate Roofing Sheets,Clear Solid Polycarbonate Sheet,4Mm Solid Polycarbonate Sheet NINGBO CHAOMEI PLASTIC CO.,LTD , https://www.chaomeiplastic.com
How to adjust the discharge port of the cone crusher?
During the crushing process, the moving cone liner and the fixed cone liner are continuously worn, so that the discharge port is gradually increased. In order to ensure a certain product size, it is necessary to continuously adjust the size of the discharge port with the wear and tear. The adjustment of the discharge port is realized by means of the saw-shaped thread lifting and lowering cone liner between the adjusting ring and the support sleeve. In order to lubricate the toothed threads and to facilitate adjustment and disassembly, the threads must have sufficient clearance.